Sunday, March 6, 2011

Bathroom's almost done too

At this point, it's a draw as to whether the bathroom or the kitchen will be finished first. The kitchen counter is installed but no pictures yet since we're not completely happy with the installation and need the installers to come back and fix some problems.The kitchen window will be installed by the end of the week then we wait for K to come back finish trimming it out. The pantry doors are still out of stock (any one surprised?) and we've decided that the stainless steel-look plinths from Ikea are really cheap and crappy. It's basically particleboard cover with a piece of foil that will scratch easily so we've decided not to use it. Instead, K says he can get actual sheets of stainless steel cut to size and installed. It'll be more durable and look much better, plus it's not wildly expensive. We're sold on the idea.

The bathroom is almost done. The tub/shower tile is up. The original tile was a glossy white subway tile which we liked so we stuck with it. The only change we made here was to install it in a vertical subway pattern instead of the usual horizontal. It looks fabulous! It heightens the room by drawing your eye upwards. Plus it picks up and carries the pattern from the floor, giving and nice, cohesive look, I think.

Still needs grout but looking good!

Tiles with grout and the bold look of Kohler

While the guys have been concentrating on the main floor, I've been picking away at getting the laundry area finished off. We put in a little storage are with a counter for folding clothes and I love it. It's nice to have a high, flat surface to fold on. I was using the bed for fold but it's a pretty low bed so my back was getting sore from bending over. We'll be posting some pictures of the laundry area as soon as it's completed (it's still missing some hardware) but for now, here's a photo of me assembling a door with a drawer attachment.

No comments:

Post a Comment